Blog

Step-by-Step: Our 6-Stage Raised Access Floor Restoration Process

Restoring raised access floors successfully requires a clear, repeatable method. At Fenix Contractors we use a six-stage process designed for commercial environments — delivering consistent, high-quality results while minimising downtime and waste.

Below is our step-by-step approach so you know exactly what to expect.

1. Free Site Assessment

Every project starts with a free, no-obligation assessment. Our technicians inspect panel condition, pedestal integrity, adhesive levels and subfloor status. This assessment defines the scope, timeline and a transparent quotation — so you know whether restoration or selective replacement is the right choice.

2. Carpet Tile Removal

We remove existing carpet tiles and coverings carefully, protecting adjacent surfaces and services. Proper tile removal prevents further damage to panels and prepares the system for effective adhesive treatment.

3. Adhesive & Tackifier Removal

Using specialist equipment and tested chemical treatments, we break down and remove tackifier and glue without harming metal encapsulated panels. This stage is critical — it restores surface flatness and prepares panels for deep cleaning.

4. Panel Restoration & Cleaning

Panels undergo a mechanical and manual cleaning process to remove residue, stains and surface imperfections. Edge and corner details are refined to ensure uniform appearance and fit. Where necessary, minor repairs are made to restore panel integrity.

5. Quality Inspection

Each panel is inspected for cleanliness, structural soundness and dimensional consistency. We use checklists and measuring tools to ensure panels meet reuse standards for CAT A and CAT B fit-outs.

6. Final Handover

Panels are returned and reinstalled, and we carry out a final site inspection with the client. We ensure the floor is level, clean and ready for immediate use. The handover includes documentation and recommendations for ongoing maintenance.

Why this process works

Predictable outcomes: A standardised workflow reduces surprises.

Lower costs: Restoration avoids unnecessary replacement.

Minimal disruption: Many stages can be completed while spaces remain operational.

Sustainability: Reuse reduces waste and supports ESG goals.

Ready to see how this works for your building?

Book a free site assessment with Fenix Contractors — we’ll evaluate your RAF condition and provide a clear, no-nonsense plan.

FAQ — 6-Stage RAF Restoration Process

1. How long does the full restoration process take?

Timelines vary by site size, but many projects are completed faster than full replacement — often 40–60% quicker. We provide a project timeline after the site assessment.

2. Can you work in live office environments?

Yes. Our methods and protection measures allow us to work in live spaces with minimal disruption and controlled dust management.

3. Will restored panels match in appearance?

When restored professionally, panels achieve a consistent, like-new finish suitable for CAT A and CAT B environments.

4. Do you always remove all adhesive?

Our aim is full adhesive removal. In rare cases with extreme contamination we recommend a mixed approach — restore where possible and replace where necessary.

5. Do you provide documentation after handover?

Yes. We deliver inspection reports, before/after photos and maintenance recommendations as part of the final handover.